Ormes Road, Neath
Scheduled to being on site in 2021, this new home is due to replace a dilapidated house already on the site. The site offered an interesting challenge, being located on a bank with difficult infrastructure.
| RIBA Stages | 0 - 3 |
| Location | Neath |
| Client | Private Client |
| Engineer | Grade Consulting |